• Volume 22 Issue 5
    Aug.  2021
    Turn off MathJax
    Article Contents
    ZHAO Yiqiang, XUAN Anjun, TIAN Naiyuan, CUI Jian, ZHANG Kai. Hot Metal Desulfurization Pre-arrange System of Baosteel[J]. Chinese Journal of Engineering, 2000, 22(5): 404-408. doi: 10.13374/j.issn1001-053x.2000.05.004
    Citation: ZHAO Yiqiang, XUAN Anjun, TIAN Naiyuan, CUI Jian, ZHANG Kai. Hot Metal Desulfurization Pre-arrange System of Baosteel[J]. Chinese Journal of Engineering, 2000, 22(5): 404-408. doi: 10.13374/j.issn1001-053x.2000.05.004

    Hot Metal Desulfurization Pre-arrange System of Baosteel

    doi: 10.13374/j.issn1001-053x.2000.05.004
    • Received Date: 2000-01-28
      Available Online: 2021-08-27
    • Based on the comprehensive research of the desulfurization of hot metal pretredrient process and working procedure of No. 1 Steel Plan of Baosteel, the offiine running software has been gotten. This software is designed as open system and it follows the rulers of the Token Management (integraion cost of desulfuration as the objective function). Under the offline running result, it is useful to reduce the desulfurizaition cost and promote the competition by applying this Optimization Model Software.

       

    • loading
    • 加載中

    Catalog

      通訊作者: 陳斌, bchen63@163.com
      • 1. 

        沈陽化工大學材料科學與工程學院 沈陽 110142

      1. 本站搜索
      2. 百度學術搜索
      3. 萬方數據庫搜索
      4. CNKI搜索
      Article views (298) PDF downloads(10) Cited by()
      Proportional views
      Related

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return
      中文字幕在线观看