• Volume 38 Issue 8
    Jul.  2021
    Turn off MathJax
    Article Contents
    ZHOU Bing-hai, LI Ming, SU Yi. Scheduling method for dual-blade cluster tools with parallel chambers and reentrancy constraints[J]. Chinese Journal of Engineering, 2016, 38(8): 1190-1195. doi: 10.13374/j.issn2095-9389.2016.08.020
    Citation: ZHOU Bing-hai, LI Ming, SU Yi. Scheduling method for dual-blade cluster tools with parallel chambers and reentrancy constraints[J]. Chinese Journal of Engineering, 2016, 38(8): 1190-1195. doi: 10.13374/j.issn2095-9389.2016.08.020

    Scheduling method for dual-blade cluster tools with parallel chambers and reentrancy constraints

    doi: 10.13374/j.issn2095-9389.2016.08.020
    • Received Date: 2015-10-23
      Available Online: 2021-07-22
    • To effectively solve the scheduling problems of dual-blade cluster tools with parallel processing chambers and reentrancy constraints in semiconductor manufacturing, this article introduces a scheduling method centering on optimal searching. Firstly, according to the optimization search rule (FIFO), a mathematical programming model of 4-chamber dual-blade cluster tools with parallel processing chambers and reentrancy constraints was built to minimize the makespan of the system. Combined with the concept of virtual buffer module, an optimum searching algorithm was proposed based on the robot swap strategy. Finally, simulation experiments were conducted for the proposed algorithm, and the results indicate that the algorithm is feasible and effective.

       

    • loading
    • 加載中

    Catalog

      通訊作者: 陳斌, bchen63@163.com
      • 1. 

        沈陽化工大學材料科學與工程學院 沈陽 110142

      1. 本站搜索
      2. 百度學術搜索
      3. 萬方數據庫搜索
      4. CNKI搜索
      Article views (184) PDF downloads(13) Cited by()
      Proportional views
      Related

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return
      中文字幕在线观看