Structure of Optimal Solution for E/T Scheduling
-
摘要: 討論了帶有4項懲罰指標的提前/拖延調度問題,目的是確定最優公共交貨期和確定最優排序.給出了最優公共交貨期的確定方法,提出了聯合懲罰因子的概念,并討論了最優解的結構.Abstract: A kind of E/T scheduling problem with four penalty factor is discussed in order to determine the optimal sequences and optimal common due date. A method about how to determine common due date is presented, the concept of combinative penalty factor is proposed, and the structure of optimal solution is discussed.
-
Key words:
- E/T scheduling /
- completion time /
- due date /
- penalty factor
-