• Volume 22 Issue 3
    Aug.  2021
    Turn off MathJax
    Article Contents
    XIE Tiejun, CHENG Tao, LIU Renping. Structure of Optimal Solution for E/T Scheduling[J]. Chinese Journal of Engineering, 2000, 22(3): 284-288. doi: 10.13374/j.issn1001-053x.2000.03.026
    Citation: XIE Tiejun, CHENG Tao, LIU Renping. Structure of Optimal Solution for E/T Scheduling[J]. Chinese Journal of Engineering, 2000, 22(3): 284-288. doi: 10.13374/j.issn1001-053x.2000.03.026

    Structure of Optimal Solution for E/T Scheduling

    doi: 10.13374/j.issn1001-053x.2000.03.026
    • Received Date: 1999-10-21
      Available Online: 2021-08-27
    • A kind of E/T scheduling problem with four penalty factor is discussed in order to determine the optimal sequences and optimal common due date. A method about how to determine common due date is presented, the concept of combinative penalty factor is proposed, and the structure of optimal solution is discussed.

       

    • loading
    • 加載中

    Catalog

      通訊作者: 陳斌, bchen63@163.com
      • 1. 

        沈陽化工大學材料科學與工程學院 沈陽 110142

      1. 本站搜索
      2. 百度學術搜索
      3. 萬方數據庫搜索
      4. CNKI搜索
      Article views (401) PDF downloads(6) Cited by()
      Proportional views
      Related

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return
      中文字幕在线观看