• Volume 28 Issue 7
    Aug.  2021
    Turn off MathJax
    Article Contents
    CHEN Chaowu, DONG Shaohua, DING Wenying. Optimization of multi-stage production planning in ERW pipe manufacturing[J]. Chinese Journal of Engineering, 2006, 28(7): 691-695. doi: 10.13374/j.issn1001-053x.2006.07.018
    Citation: CHEN Chaowu, DONG Shaohua, DING Wenying. Optimization of multi-stage production planning in ERW pipe manufacturing[J]. Chinese Journal of Engineering, 2006, 28(7): 691-695. doi: 10.13374/j.issn1001-053x.2006.07.018

    Optimization of multi-stage production planning in ERW pipe manufacturing

    doi: 10.13374/j.issn1001-053x.2006.07.018
    • Received Date: 2005-04-12
    • Rev Recd Date: 2006-03-02
    • Available Online: 2021-08-24
    • Multi-stage production planning plays an important role in improving the production rate and energy saving in modern manufacturing industry. Based on the analysis of production flow and planning of an electric resistance welding (ERW) manufacturing enterprise, this paper proposes an advanced/delayed punishment mathematical model of multistage production planning. A local optimal solution for it is obtained by the real number-coding genetic algorithm. Simulation results indicate that the model and algorithm are feasible and efficacious. The presented solution has well applied to practical ERW production planning.

       

    • loading
    • 加載中

    Catalog

      通訊作者: 陳斌, bchen63@163.com
      • 1. 

        沈陽化工大學材料科學與工程學院 沈陽 110142

      1. 本站搜索
      2. 百度學術搜索
      3. 萬方數據庫搜索
      4. CNKI搜索
      Article views (200) PDF downloads(10) Cited by()
      Proportional views
      Related

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return
      中文字幕在线观看