• Volume 30 Issue 2
    Aug.  2021
    Turn off MathJax
    Article Contents
    GUO Hanjie, YIN Zhiming, WANG Hongwei. Optimum schedule in calcination process of metallurgical active lime[J]. Chinese Journal of Engineering, 2008, 30(2): 148-151. doi: 10.13374/j.issn1001-053x.2008.02.001
    Citation: GUO Hanjie, YIN Zhiming, WANG Hongwei. Optimum schedule in calcination process of metallurgical active lime[J]. Chinese Journal of Engineering, 2008, 30(2): 148-151. doi: 10.13374/j.issn1001-053x.2008.02.001

    Optimum schedule in calcination process of metallurgical active lime

    doi: 10.13374/j.issn1001-053x.2008.02.001
    • Received Date: 2006-12-30
    • Rev Recd Date: 2007-05-30
    • Available Online: 2021-08-06
    • The calcination process of metallurgical active lime in a rotation kiln was simulated in laboratory. It is found that preheating temperature, pre-heating time, calcination temperature and calcination time are the most important factors in this process. The optimal parameters is the pre-heating temperature of 700℃, the pre-heating time of 60 min, the calcination temperature of 1150℃, and the calcination time of 15 min. Under this optimal condition, the activity of active lime produced by the raw material of limestone from Xuanhua Steel in China is 410 mL.

       

    • loading
    • 加載中

    Catalog

      通訊作者: 陳斌, bchen63@163.com
      • 1. 

        沈陽化工大學材料科學與工程學院 沈陽 110142

      1. 本站搜索
      2. 百度學術搜索
      3. 萬方數據庫搜索
      4. CNKI搜索
      Article views (303) PDF downloads(12) Cited by()
      Proportional views
      Related

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return
      中文字幕在线观看