    LU Hongjian, GAO Yongtao, WU Shunchuan, PAN Guihao. Production capacity optimization of Shirengou Iron Mine during turning open pit into underground mining[J]. Chinese Journal of Engineering, 2008, 30(9): 967-971. doi: 10.13374/j.issn1001-053x.2008.09.001
    Citation: LU Hongjian, GAO Yongtao, WU Shunchuan, PAN Guihao. Production capacity optimization of Shirengou Iron Mine during turning open pit into underground mining[J]. Chinese Journal of Engineering, 2008, 30(9): 967-971. doi: 10.13374/j.issn1001-053x.2008.09.001

    Production capacity optimization of Shirengou Iron Mine during turning open pit into underground mining

    doi: 10.13374/j.issn1001-053x.2008.09.001
    • Received Date: 2007-07-18
    • Rev Recd Date: 2007-10-17
    • Available Online: 2021-08-06
    • Rational determination of production capacity is one of the technical problems during turning open pit into underground mining. With Shirengou Iron Mine as the object, seven projects feasible in technology were brought forward in combination with its specific situation. Considering the integral effect of technical, economical and social factors on the production capacity and according to mining codes, standards and regulations, it is obtained by fuzzy comprehensive evaluation and analytic hierarchy process that the best production capacity of Shirengou Iron Mine during turning open pit into underground mining is 2 150 000 t·a-1.

       

    • loading
    • 加載中

    Catalog

      通訊作者: 陳斌, bchen63@163.com
      • 1. 

        沈陽化工大學材料科學與工程學院 沈陽 110142

      1. 本站搜索
      2. 百度學術搜索
      3. 萬方數據庫搜索
      4. CNKI搜索
      Article views (267) PDF downloads(8) Cited by()
      Proportional views
      Related

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return
      中文字幕在线观看