• Volume 34 Issue S1
    Jul.  2021
    Turn off MathJax
    Article Contents
    NING Mei, ZHUANG Gang, DOU Zhi-chao, LI Zhi-qun. Analysis of reasons for bursting of seamless pipe production in hydraulic tests[J]. Chinese Journal of Engineering, 2012, 1(S1): 95-103. doi: 10.13374/j.issn1001-053x.2012.s1.015
    Citation: NING Mei, ZHUANG Gang, DOU Zhi-chao, LI Zhi-qun. Analysis of reasons for bursting of seamless pipe production in hydraulic tests[J]. Chinese Journal of Engineering, 2012, 1(S1): 95-103. doi: 10.13374/j.issn1001-053x.2012.s1.015

    Analysis of reasons for bursting of seamless pipe production in hydraulic tests

    doi: 10.13374/j.issn1001-053x.2012.s1.015
    • Received Date: 2012-02-22
      Available Online: 2021-07-30
    • Macroscopic and microscopic analyses were conducted for 9 typical bursting incidents in hydraulic tests of seamless pipe production. The analysis results show that bursting in the hydraulic tests is always related to some defects existing in some parts of pipes. Defects in continuous casting billets include surface cracks, surface slag and surface carburetion, surface copper infiltration, central segregation and internal inclusion segregation, etc. Defects existing in hot rolled pipes include surface scratches, ununiformity or reduction of wall thickness, and so on. Defects caused by tube processing include surface quench cracks, abnormal microstructure, low yield strength and low precision of thread machining of pipe ends. Suggestions for improvements are also provided according to the analysis results

       

    • loading
    • 加載中

    Catalog

      通訊作者: 陳斌, bchen63@163.com
      • 1. 

        沈陽化工大學材料科學與工程學院 沈陽 110142

      1. 本站搜索
      2. 百度學術搜索
      3. 萬方數據庫搜索
      4. CNKI搜索
      Article views (267) PDF downloads(10) Cited by()
      Proportional views
      Related

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return
      中文字幕在线观看